Question 1
After some debate the delivery team decides to use the product roadmap because it will help them:
- A. Align strategy to goals
- B. Maintain defined scope
- C. Keep the team on schedule
- D. Align increments with product vision
Show answer and explanation ▾
Correct answer: D
A product roadmap shows how increments of work line up with the product vision over time. That is what helps a delivery team decide what to build and in what order.
Why the other options are wrong:
- A. Aligning strategy to goals is a strategy-level concern, not the delivery team's use of the roadmap.
- B. A roadmap is not a tool for locking scope; agile scope stays flexible.
- C. Keeping the team on schedule is the job of iteration planning, not the roadmap.
Question 2
A team has been delivering a steady stream of small value increments towards a goal for 4 months, and has completed several solution components, with several still potentially doable. The solution owner examines the reactions to the delivered components from customers, and decides which one(s) the team will do next. The solution owner is demonstrating:
- A. Adaptation to revised strategy
- B. Change in response to feedback and learning
- C. Action in response to activity
- D. Maintenance of solution alignment
Show answer and explanation ▾
Correct answer: B
The solution owner looks at how customers react to delivered components and then chooses what comes next. That is changing course in response to feedback and learning.
Why the other options are wrong:
- A. Nothing in the scenario says the strategy has been revised.
- C. Acting in response to activity is not the aim; the choice is driven by feedback on value.
- D. The scenario is about choosing the next work from feedback, not about keeping the solution aligned.
Question 3
The team decides a story is too big to do in one iteration. The correct technique to apply at this point is:
- A. MoSCoW approach
- B. Story decomposition
- C. Epic analysis
- D. Story partitioning
Show answer and explanation ▾
Correct answer: B
When a story is too big for one iteration, the team breaks it into smaller stories that still deliver value. This technique is story decomposition.
Why the other options are wrong:
- A. MoSCoW is a prioritization technique and does not split stories.
- C. Epic analysis is not the technique for splitting a story that is too large.
- D. Story partitioning is not the technique named in the guide for this situation.
Question 4
A team discovers that their accomplished deliverables are not impacting the goal strongly. They have several more iterations of similar work scheduled and are ready to execute, and they expect delivering this work will produce similar poor impacts. They choose to shift their delivery work to a different initiative while they assess the poorly performing work for other ways that would produce good results. This shows that the team values which of the following things highest?
- A. Documenting solution outcomes
- B. Developing new processes
- C. Improving collaboration
- D. Responding to change
Show answer and explanation ▾
Correct answer: D
The team saw that its work was not moving the goal and shifted to a different initiative while it reassessed. Changing direction when results are weak shows it values responding to change.
Why the other options are wrong:
- A. Documenting outcomes is not what the team prioritized in the scenario.
- B. Nothing about developing new processes is described.
- C. Collaboration is not the point; the team changed its direction.
Question 5
While discussing team norms, the team determines that within the Delivery Horizon, communication will be:
- A. Clear or reviewed
- B. Appropriate and planned
- C. Casual and as needed
- D. Consistent or scheduled
Show answer and explanation ▾
Correct answer: D
Within the Delivery Horizon, team communication is agreed to be consistent or scheduled, so people know when and how information is shared.
Why the other options are wrong:
- A. Clear or reviewed is not how the guide describes communication norms in this horizon.
- B. Appropriate and planned is not the wording used for this horizon.
- C. Casual and as needed describes ad hoc communication, which is not the norm here.
Question 6
While working at the strategy level, the team needs to ensure stakeholders actively support an environment for constructive communication, collaboration, and continuous improvement. They decide to use the following to achieve this goal?
- A. Product Roadmap
- B. Reviews
- C. Behavior driven development
- D. Release Plans
Show answer and explanation ▾
Correct answer: A
A product roadmap gives stakeholders a shared, visible picture of where the product is heading and how the vision will be reached over time. Building and revisiting it together at the strategy level keeps communication open and lets direction be adjusted as the organization learns.
Why the other options are wrong:
- B. Reviews look back at work that has already been delivered and are not the strategy level technique the team selects here.
- C. Behavior driven development specifies examples and tests for individual stories at the Delivery Horizon.
- D. Release plans set out what goes into upcoming releases, which is narrower than the strategy level view needed here.
Question 7
The team is very busy working on a top priority initiative. They have delivered many user stories and have many left to complete. However, the components they are delivering are not yet delivering end-to-end business value.
How can the team maintain understanding of the big picture without getting lost in the details?
- A. Create a gantt chart
- B. Refine their backlog
- C. Create a story map
- D. Fully elaborate user stories
Show answer and explanation ▾
Correct answer: C
A story map arranges user stories under the user activities they support, so the team can see how individual stories fit together into a complete flow of value. It keeps the big picture visible while detailed stories are delivered.
Why the other options are wrong:
- A. A Gantt chart shows a task schedule and does not show how stories combine into user value.
- B. Refining the backlog adds detail and order to items but does not give a view of the whole solution.
- D. Fully elaborating user stories adds more detail, which is the opposite of stepping back to see the big picture.
Question 8
When decomposing stories, the concept of “breadth before depth” signifies progressively breaking down:
- A. Estimates and resources required to accomplish the story
- B. Backlog items to the lowest level of detail upfront
- C. Business goals into user stories representing smaller increments of value
- D. Tests to align with usable functionality delivered through each story
Show answer and explanation ▾
Correct answer: C
Breadth before depth means first laying out the whole scope at a high level, then progressively breaking business goals down into features and user stories that each represent a smaller increment of value. Detail is added only as items come closer to delivery.
Why the other options are wrong:
- A. Estimates and resources are planning inputs, not what story decomposition breaks down.
- B. Taking backlog items to the lowest level of detail upfront is depth first, which this concept avoids.
- D. Aligning tests with delivered functionality is part of acceptance criteria work, not story decomposition.
Question 9
The delivery team is in a meeting identifying cycle time improvement opportunities for delivery of the final product. They decide to apply the following technique:
- A. Backlog management
- B. Value stream mapping
- C. Story decomposition
- D. Story mapping
Show answer and explanation ▾
Correct answer: B
Value stream mapping lays out every step needed to deliver a product, with the time spent working and waiting at each one. It exposes delays and steps that add no value, which is how a team finds ways to shorten cycle time.
Why the other options are wrong:
- A. Backlog management keeps work items ordered and current but does not analyze the flow of delivery steps.
- C. Story decomposition breaks goals into smaller stories and does not measure cycle time.
- D. Story mapping organizes stories around user activities and does not show process delays.
Question 10
The team members are discussing the level of effort that different backlog items are likely to require, and how much effort is available for the next sprint. This is an example of the principle:
- A. Analyze to determine what is valuable
- B. Understand what is doable
- C. Respect for individuals
- D. Get real using examples
Show answer and explanation ▾
Correct answer: B
Understand what is doable is about working out what can realistically be delivered within the constraints the team faces. Comparing the effort backlog items need with the capacity available for the next sprint is a direct application of it.
Why the other options are wrong:
- A. Analyze to determine what is valuable deals with the worth of items, not the effort and capacity to deliver them.
- C. Respect for individuals is not one of the seven agile business analysis principles.
- D. Get real using examples is about building shared understanding with concrete examples, not about effort and capacity.
Question 11
Making decisions based on a realistic understanding of current organizational strengths, capabilities, and challenges, is represented in the agile analysis principle of:
- A. See the whole
- B. Individuals and interactions over process and tools
- C. Think as a customer
- D. Understand what is doable
Show answer and explanation ▾
Correct answer: A
See the whole means analyzing the need in its full context, including the organization as it really is today. Decisions grounded in a realistic view of current strengths, capabilities and challenges apply this principle.
Why the other options are wrong:
- B. Individuals and interactions over processes and tools is an Agile Manifesto value, not an agile analysis principle.
- C. Think as a customer focuses on the customer view of the solution, not on the organization's own capabilities.
- D. Understand what is doable concerns what the team can deliver within its constraints, not the wider organizational context.
Question 12
During a team meeting, the team discuss a technique where real or perceived benefits to the customer, direct costs and opportunity costs are assessed.
Which technique are they discussing?
- A. Minimum Viable Product
- B. Impact Mapping
- C. Kano Analysis
- D. Value Modeling
Show answer and explanation ▾
Correct answer: D
Value modeling assesses what a solution is worth by weighing the real or perceived benefits to the customer against its direct costs and opportunity costs. The result helps the team focus on the work that delivers the most value.
Why the other options are wrong:
- A. A minimum viable product is the smallest release used to learn from customers, not a technique for weighing benefits and costs.
- B. Impact mapping links goals to actors, impacts and deliverables and does not assess costs.
- C. Kano analysis classifies features by their effect on customer satisfaction and does not assess costs.
Question 13
At the Initiative Horizon, the solution owner using iterative planning principles decides to plan for a period of:
- A. 6-12 months because competitive analysis requires thorough analysis
- B. 1-3 months because it can be determined if needs are being met
- C. 3-6 months because stability is required for long term planning
- D. 1-2 weeks because it aligns with the increments delivered by the team
Show answer and explanation ▾
Correct answer: B
Iterative planning favors short time frames so that plans can be tested against results. Planning an initiative over a period of one to three months is long enough to deliver something meaningful and short enough to learn whether the need is being met.
Why the other options are wrong:
- A. A 6 to 12 month period is too long to learn quickly whether the need is being met.
- C. A 3 to 6 month period chosen for stability works against iterative planning, which expects plans to change.
- D. A 1 to 2 week period is the time frame of delivery iterations, not of initiative planning.
Question 14
Planning horizons are important because they allow an organization to:
- A. Support a structured response supported by all levels of the organization
- B. Sense and respond to their changing environment
- C. Ensure senior management is informed and engaged
- D. Allow management guidance for decision making
Show answer and explanation ▾
Correct answer: B
The three horizons give an organization different time frames for planning and feedback, from strategy through initiatives to delivery. Learning passes between them, which lets the organization sense changes in its environment and respond to them.
Why the other options are wrong:
- A. A structured response backed by every level is not the stated purpose of planning horizons.
- C. Keeping senior management informed is a side effect of good communication, not why horizons matter.
- D. Management guidance for decisions is not the purpose of planning horizons, which exist to enable learning and adaptation.
Question 15
The team is creating plans at the Strategy Horizon. Diverse opinions are delaying this effort because different people are focused on different timeframes. After some discussion the team realizes they need to focus their efforts on the following viewpoint:
- A. Business view of the teams working on the initiatives
- B. Micro-view of the potential changes to the organization
- C. Broader view of the impact of the change to the organization
- D. Local view of the effect on the community.
Show answer and explanation ▾
Correct answer: C
The Strategy Horizon takes the widest and longest view of the three horizons. Work at this level looks at how a change affects the organization as a whole, so the team should set narrower time frames aside and focus on that broader impact.
Why the other options are wrong:
- A. A view of the teams working on the initiatives belongs to the Initiative Horizon.
- B. A micro view of potential changes is too narrow for strategy level planning.
- D. A local view is far narrower than the organization wide view the Strategy Horizon needs.
Question 16
The team is expanding and refining customer scenarios as the solution components are being developed. This is an application of the following agile business analysis principle:
- A. Understand what is doable
- B. Avoid waste
- C. Stimulate collaboration and continuous improvement
- D. Get Real Using Examples
Show answer and explanation ▾
Correct answer: D
Get real using examples means building shared understanding through concrete examples and scenarios instead of abstract statements. Expanding and refining customer scenarios while components are developed applies this principle directly.
Why the other options are wrong:
- A. Understand what is doable concerns what can be delivered within constraints, not the use of scenarios.
- B. Avoid waste is about removing work that adds no value, not about refining scenarios.
- C. Stimulate collaboration and continuous improvement concerns how people work together and improve, not the use of scenarios.
Question 17
In situations where learning is frequent and fast-paced, and the product owner is reacting to the new information, the prioritization of solution components should be expected to:
- A. Be unaffected
- B. Remain stable
- C. Alter intermittently
- D. Change frequently
Show answer and explanation ▾
Correct answer: D
Priorities in agile work reflect the best current understanding of value. When learning arrives quickly and the product owner acts on it, the order of solution components should be expected to change frequently.
Why the other options are wrong:
- A. Priorities cannot be unaffected when the product owner is reacting to new information.
- B. Priorities do not remain stable when learning is frequent and fast paced.
- C. Intermittent change understates how often priorities move when learning is frequent.
Question 18
While quality checking the written user stories, the team ensures one of the components included in the attributes of a user story is:
- A. The explanation of the story’s cost
- B. The stakeholder responsible for testing
- C. The benefit or business value received by the user when the story is implemented
- D. The title describing the goal of the delivery cycle
Show answer and explanation ▾
Correct answer: C
A user story states who wants something, what they want and why. The why is the benefit or business value the user receives once the story is implemented, and it is one of the core parts of the story.
Why the other options are wrong:
- A. An explanation of the story's cost is not a component of a user story.
- B. The stakeholder responsible for testing is not a component of a user story.
- D. A title describing the goal of the delivery cycle describes an iteration goal, not a user story.
Question 19
Members of the team facilitate key stakeholders through an exercise to develop a mutual understanding of what is in and out of scope for the initiative and specify the organization value to achieve in the initiative.
What technique did they use?
- A. Sprint Goals
- B. Visioning
- C. Purpose Alignment Model
- D. Story elaboration
Show answer and explanation ▾
Correct answer: B
Visioning brings stakeholders together to agree on the purpose of an initiative, the value the organization wants from it and the boundaries of what is in and out of scope. The result is a shared vision that guides later decisions.
Why the other options are wrong:
- A. Sprint goals set the objective of a single iteration, not the scope and value of a whole initiative.
- C. The purpose alignment model rates features by how critical and differentiating they are and does not define scope.
- D. Story elaboration adds detail to individual stories just before delivery.
Question 20
A product owner has selected a particular workflow, and needs to identify potential epics and initiatives to learn more about it. They gather a group together to visually identify activities and themes of possible interest.
What technique is typical for this purpose?
- A. Value stream mapping
- B. Cartesian mapping
- C. Story Mapping
- D. Data flow mapping
Show answer and explanation ▾
Correct answer: C
Story mapping is a visual, collaborative technique that lays out the activities in a workflow in sequence and groups related stories beneath them. Walking through a workflow this way surfaces themes, epics and initiatives worth exploring.
Why the other options are wrong:
- A. Value stream mapping analyzes the steps and delays in delivering a product, not user activities and themes.
- B. Cartesian mapping is not an agile analysis technique.
- D. Data flow mapping shows how data moves between processes and stores, not user activities and themes.
Question 21
The delivery team is reviewing information that starts with a broad view of the solution components and drills down to a level of granularity, including acceptance criteria, that supports solution build activities. The team is using the following technique:
- A. Story elaboration
- B. Real options
- C. Detailed story
- D. Backlog management
Show answer and explanation ▾
Correct answer: A
Story elaboration takes a story from a broad statement to the detail the team needs to build it, including acceptance criteria. It is done just in time, shortly before the story is delivered.
Why the other options are wrong:
- B. Real options is a technique for deciding when to make a decision, not for detailing stories.
- C. Detailed story is not an agile analysis technique.
- D. Backlog management orders and maintains the list of items and does not drill a story down to build level detail.
Question 22
At the initiative level, the team concludes pre-defined *measures of success, *desired outcomes being reached, and *alignment with organizational strategy can all be used to:
- A. Access the viability of solution components built by the team
- B. Enlist new team members to help develop additional solution components
- C. Determine the likely response to the solution components
- D. Identify possible adoption of a solution by your customers
Show answer and explanation ▾
Correct answer: D
At the Initiative Horizon the team judges whether the solution is succeeding with the people it is meant for. Measures of success defined in advance, evidence that desired outcomes are being reached and alignment with strategy together indicate whether customers are likely to adopt the solution.
Why the other options are wrong:
- A. Judging the viability of individual solution components is not what these three indicators are used for.
- B. Enlisting new team members is a staffing matter unrelated to these indicators.
- C. Predicting a response to individual solution components is not what these three indicators are used for.
Question 23
At the initiative level, solution recommendations incorporate the following:
- A. *Iteration plan for the start of delivery *Projected impact to future delivery capability *Priority of the identified need
- B. *Ranked goal review *Impacts on other initiatives *Time & materials analysis
- C. *Requirements management plan *MosCoW feature quadrants *Analysis of similar plans from the past
- D. *Validation check on any assumptions already made *Projected impact on identified need *Estimated costs, including time and money, and others if relevant
Show answer and explanation ▾
Correct answer: D
A solution recommendation at the Initiative Horizon gives decision makers enough to choose: a check on the assumptions already made, the projected impact on the identified need, and the estimated costs in time, money and anything else relevant.
Why the other options are wrong:
- A. An iteration plan for the start of delivery belongs to delivery planning, not to a solution recommendation.
- B. A ranked goal review and time and materials analysis are not the contents of a solution recommendation.
- C. A requirements management plan and an analysis of past plans are not the contents of a solution recommendation.
Question 24
The team is discussing one of the six key terms used to discuss both business analysis and its relationship with common terminology.
Specifically, they are describing improvements as being deliberate and achieved though business analysis. This team is discussing the:
- A. Solution
- B. Need
- C. Context
- D. Change
Show answer and explanation ▾
Correct answer: D
In the Business Analysis Core Concept Model, change is the act of transformation in response to a need. It works to improve the performance of an enterprise, and those improvements are deliberate and controlled through business analysis activities.
Why the other options are wrong:
- A. Solution is a specific way of satisfying one or more needs in a context.
- B. Need is a problem or opportunity to be addressed.
- C. Context is the circumstances that influence, are influenced by and provide understanding of the change.
Question 25
A team demonstrating the following characteristics: Expects rapid change Incorporates learning & feedback Has a preference for shorter time frames Treats plans as testable hypothesis is following planning practices that are described as:
- A. Predictive and adaptive
- B. Adaptive and hypothesis
- C. Iterative and predictive
- D. Iterative and adaptive
Show answer and explanation ▾
Correct answer: D
Agile planning is iterative, working in short time frames that are repeated, and adaptive, expecting change and folding learning and feedback back into the plan. Treating a plan as a hypothesis to be tested is typical of this approach.
Why the other options are wrong:
- A. Predictive planning fixes the plan upfront and does not expect rapid change.
- B. Hypothesis is not a name for a planning approach.
- C. Predictive planning does not treat plans as hypotheses to be tested.
Question 26
The team demonstrates they value customer collaboration over contract negotiation by:
- A. Constantly refining their understanding of the need based on stakeholder feedback
- B. Learning what works by trying things out
- C. Making people the center of the work
- D. Updating the backlog based on the solution created
Show answer and explanation ▾
Correct answer: A
Customer collaboration over contract negotiation means working with stakeholders continuously instead of fixing requirements upfront and holding them to it. A team that keeps refining its understanding of the need from stakeholder feedback is living this value.
Why the other options are wrong:
- B. Learning what works by trying things out reflects experimentation, not collaboration with the customer.
- C. Making people the center of the work reflects individuals and interactions over processes and tools.
- D. Updating the backlog based on the solution created does not involve the customer.
Question 27
A team has been delivering a steady stream of small value increments and has completed several solution components, with some still remaining.
The solution owner examines the reactions to the delivered components from customers, and decides that the need has been met and the remaining potential components won’t deliver enough additional value to justify doing them. The solution owner will:
- A. Request Strategy Horizon input about what action to take
- B. Accept the work is complete and cancel remaining work
- C. Fully document the working initiative
- D. Ask the team to come up with new, more valuable, solution components for the initiative
Show answer and explanation ▾
Correct answer: A
Decisions to continue, change or cancel an initiative are made at the Strategy Horizon. When the solution owner judges that the need has been met, that learning is passed up so the strategy level can decide what happens next.
Why the other options are wrong:
- B. Cancelling the remaining work is not the solution owner's decision to make alone.
- C. Fully documenting the initiative adds no value and does not settle what happens to the remaining work.
- D. Asking for new components keeps the initiative going after the need has been met, which is waste.
Question 28
The team establishes ground rules for considering business analysis performance improvements. They agree that speed and accuracy of executing analysis activities becomes very important at the following horizon:
- A. Feedback horizon
- B. Strategy horizon
- C. Initiative horizon
- D. Delivery Horizon
Show answer and explanation ▾
Correct answer: D
The Delivery Horizon has the shortest time frame and the fastest feedback, with analysis done just in time for the team building the solution. At this level the speed and accuracy of analysis activities directly affect the flow of delivery.
Why the other options are wrong:
- A. Feedback horizon is not one of the three planning horizons.
- B. The Strategy Horizon works over the longest time frame, where speed of individual analysis activities matters least.
- C. The Initiative Horizon is not the level where speed and accuracy of analysis become most important.
Question 29
Two key components of assessing solution options at the Initiative Horizon include:
- A. Shared understanding of the need and a very broad description of solution options
- B. Shared understanding of the need and a description of the selected solution
- C. Shared understanding of the need and a detailed description of all potential solutions
- D. Shared understanding of the need and top three solution options
Show answer and explanation ▾
Correct answer: A
Assessing solution options at the Initiative Horizon starts from a shared understanding of the need and a very broad description of the options. Only enough detail is produced to compare them, and detail is added later for the option chosen.
Why the other options are wrong:
- B. A description of the selected solution comes after the options have been assessed.
- C. A detailed description of all potential solutions is wasteful analysis at this stage.
- D. The assessment is not limited to a fixed number of three options.
Question 30
While discussing the Business Analysis Approach, decisions are made about which methodology or approach to use for the initiative being considered. These discussions are happening at the:
- A. Feedback horizon
- B. Initiative horizon
- C. Strategy horizon
- D. Delivery horizon
Show answer and explanation ▾
Correct answer: C
The Strategy Horizon is where the organization decides which needs to pursue and how initiatives will be approached. Choosing the methodology or approach for an initiative under consideration is part of that decision making.
Why the other options are wrong:
- A. Feedback horizon is not one of the three planning horizons.
- B. The Initiative Horizon works within the approach already chosen for the initiative.
- D. The Delivery Horizon deals with building and delivering solution components, not with choosing the approach.
Question 31
The delivery team wants to ensure stakeholders contribute value on an ongoing basis to delivering the solution. This is an example of the following agile analysis principle:
- A. Retrospective input and observations
- B. Avoiding waste and unused functionality
- C. Stimulate collaboration and continuous improvement
- D. Value of assessing problems in a timely manner
Show answer and explanation ▾
Correct answer: C
Stimulate collaboration and continuous improvement is about creating an environment where all stakeholders contribute to delivering value on an ongoing basis and the team keeps getting better at it.
Why the other options are wrong:
- A. Retrospective input and observations is not one of the agile analysis principles.
- B. Avoiding waste concerns removing work that adds no value, not ongoing stakeholder contribution.
- D. Value of assessing problems in a timely manner is not one of the agile analysis principles.
Question 32
After a lengthy discussion the team agrees that the agile business analysis principle of “get real using examples” aligns with the BACCM core concept of:
- A. Need
- B. Value
- C. Stakeholder
- D. Solution
Show answer and explanation ▾
Correct answer: A
Get real using examples is about building a shared understanding of what is needed by working through concrete examples. That makes it the principle most closely tied to the core concept of need.
Why the other options are wrong:
- B. Value is not the core concept this principle is aligned with, because examples are used to clarify what is needed.
- C. Stakeholder is not the core concept this principle is aligned with, because examples are used to clarify what is needed.
- D. Solution is not the core concept this principle is aligned with, because examples are used to clarify what is needed.
Question 33
The delivery team is:
prioritizing the backlog focusing on stories that deliver maximum value first maximizing the work not done.
These demonstrate application of the following agile business analysis principle:
- A. Customer collaboration over contract negotiation
- B. Stimulate collaboration and continuous improvement
- C. Think as a customer
- D. Avoid waste
Show answer and explanation ▾
Correct answer: D
Avoid waste means removing any activity that does not contribute to satisfying the need. Delivering the highest value stories first and maximizing the amount of work not done are direct applications of it.
Why the other options are wrong:
- A. Customer collaboration over contract negotiation is an Agile Manifesto value, not an agile business analysis principle.
- B. Stimulate collaboration and continuous improvement concerns how people work together, not which work is left out.
- C. Think as a customer concerns taking the customer view of the solution, not which work is left out.
Question 34
In the past, a team has been unable to deliver solutions in a timely manner and they feel this is due to the customer being unable to decide what they want. The team has decided to ask the customer to “sign-off” on their requirements. This violates the following value statement:
- A. Individuals and interactions over process and tools
- B. Prioritizing outputs over outcomes
- C. Working solutions over comprehensive documentation
- D. Customer collaboration over contract negotiation
Show answer and explanation ▾
Correct answer: D
Asking the customer to sign off on requirements treats them as a contract to be held to. Agile values customer collaboration over contract negotiation, which means working with the customer continuously as understanding of the need develops.
Why the other options are wrong:
- A. Individuals and interactions over processes and tools is not the value a requirements sign-off breaks.
- B. Prioritizing outputs over outcomes is not an Agile Manifesto value statement.
- C. Working solutions over comprehensive documentation is not the value a requirements sign-off breaks.
Question 35
At the strategy level, a major component of waste can be avoided by ensuring the enterprise:
- A. Only begins an initiative when a budget is approved for all work
- B. Has a shared understanding of organizational goals and priorities
- C. Has changes to existing work approved by senior management
- D. Has comprehensive business cases approved by senior management
Show answer and explanation ▾
Correct answer: B
At the strategy level, the largest source of waste is work on initiatives that do not serve what the organization is trying to achieve. A shared understanding of organizational goals and priorities keeps effort directed at the right needs.
Why the other options are wrong:
- A. Waiting for a budget covering all work is upfront commitment that does not prevent work on the wrong things.
- C. Senior management approval of changes adds delay and does not align work with goals.
- D. Comprehensive business cases are heavy upfront documentation, which is itself a form of waste.
Question 36
The team stops regularly to:
inspect the quality of its outcomes adapt its processes to more effectively produce outcomes.
This clearly demonstrates the team is working in an:
- A. Retrospective context
- B. Agile context
- C. Waterfall context
- D. Incremental context
Show answer and explanation ▾
Correct answer: B
Stopping regularly to inspect the quality of outcomes and adapt the process is the inspect and adapt cycle that defines working in an agile context.
Why the other options are wrong:
- A. A retrospective is a single event, not a context a team works in.
- C. A waterfall context follows a fixed plan through sequential phases without regular adaptation.
- D. An incremental context delivers in pieces but does not by definition include adapting the process.
Question 37
The team discusses the agile principle of avoiding waste and decide it’s important because it allows the team to:
- A. Verify that the budget is aligned with spending
- B. Focus on items that contribute to satisfying the need
- C. Ensure clear and effective communication
- D. Demonstrate ongoing quality backlog refinement
Show answer and explanation ▾
Correct answer: B
Avoiding waste means identifying which activities add value and which do not, then removing those that do not. This lets the team focus its effort on the items that contribute to satisfying the need.
Why the other options are wrong:
- A. Checking that the budget matches spending is financial control, not the purpose of avoiding waste.
- C. Clear and effective communication is not the reason the principle of avoiding waste matters.
- D. Demonstrating backlog refinement is an activity, not the benefit of avoiding waste.
Question 38
Which of the following is true about the Strategy Horizon?
- A. The agile mindset is the same, but we operate under a specific set of Strategic Principles
- B. The principles and agile mindset are the same as those at other horizons
- C. The principles are identical, but we use only a prescribed set of techniques
- D. The principles are identical to the other horizons, but the agile mindset is different
Show answer and explanation ▾
Correct answer: B
The agile mindset and the seven principles of agile business analysis apply at every horizon. What differs between the Strategy, Initiative and Delivery horizons is the time frame, the level of detail and the techniques most commonly used.
Why the other options are wrong:
- A. There is no separate set of Strategic Principles for the Strategy Horizon.
- C. No horizon is limited to a prescribed set of techniques.
- D. The agile mindset does not differ between horizons.
Question 39
For a user story to be considered ready for the next iteration, it must have:
- A. Just enough detail for the team to successfully complete the story
- B. Rigorous justification and defined meaning
- C. Management approval and go-ahead
- D. Quality checks and detailed documentation
Show answer and explanation ▾
Correct answer: A
A story is ready when it carries just enough detail for the team to deliver it successfully in the coming iteration. More detail than that is waste, and less leaves the team unable to complete it.
Why the other options are wrong:
- B. Rigorous justification is not a condition for a story to be ready.
- C. Management approval is not a condition for a story to be ready.
- D. Detailed documentation goes beyond the just enough detail that readiness requires.
Question 40
In a planning workshop the team breaks down the product backlog increment and can assign work to members of the team. This is referred to as:
- A. Release planning
- B. Task planning
- C. Resource planning
- D. User story writing
Show answer and explanation ▾
Correct answer: B
Task planning breaks the selected backlog items down into the tasks needed to deliver them, so that work can be taken on by members of the team for the iteration.
Why the other options are wrong:
- A. Release planning decides which features go into which release and does not break work into tasks for team members.
- C. Resource planning is not the name of this planning workshop activity.
- D. User story writing creates backlog items and does not break them into tasks.
Question 41
The sponsor is reviewing data from a new product launch and is evaluating threats and opportunities.
What are the three options when evaluating the next steps?
- A. Run a planning workshop, sequence future planning workshops, create business model canvas for all initiatives
- B. Start a new initiative, change resources for existing initiatives, cancel an existing initiative
- C. Distribute marketing surveys for customer feedback, gather internal feedback from the past delivery release, and re-evaluate product attributes
- D. Run an experiment for the next product launch, set cost/benefit of future initiatives, delay decision making
Show answer and explanation ▾
Correct answer: B
When feedback reveals threats and opportunities, strategy level decision makers have three basic choices: start a new initiative, change the resources given to existing initiatives, or cancel an existing initiative.
Why the other options are wrong:
- A. Planning workshops and business model canvases are techniques, not the decision options.
- C. Surveys and feedback gathering collect more information and are not the decision options.
- D. Running an experiment and delaying decisions are not the three decision options.
Question 42
The team determines that user stories can help them effectively create the desired outcomes because a well written user story:
- A. Invokes conversation among the team
- B. Is detailed and ready for build activities
- C. Eliminates the need for further conversation
- D. Captures all details about customer needs
Show answer and explanation ▾
Correct answer: A
A user story is a short statement of a need that acts as a placeholder for a conversation. Its purpose is to prompt discussion among the team and stakeholders so that shared understanding is built before the story is delivered.
Why the other options are wrong:
- B. A well written story is not fully detailed, since detail is added through elaboration close to delivery.
- C. A user story exists to start conversation, not to remove the need for it.
- D. A user story is deliberately brief and does not capture every detail of customer needs.
Question 43
During a delivery team meeting, some members of the team are confused about the “time” dimension depicted on a story map. After some discussion they conclude it describes:
- A. User story implementation order
- B. The project timeline
- C. Sequence of activities a user follows
- D. Time to complete stories
Show answer and explanation ▾
Correct answer: D
A story map has two dimensions. One lays out the activities a user performs, and the other, the time dimension, relates to how long the stories placed under those activities take to complete.
Why the other options are wrong:
- A. User story implementation order is not what the team concludes the time dimension describes.
- B. A story map is not a project timeline or schedule.
- C. The sequence of activities a user follows is not what the team concludes the time dimension describes.
Question 44
The standard format for documenting Behavioural Driven Development scenarios helps to maintain focus on:
- A. Verifiable conditions, events, and actions
- B. The user need and expected value.
- C. Alignment of iterations with known user concerns.
- D. The layers of modernist analysis
Show answer and explanation ▾
Correct answer: A
Behavior driven development scenarios are written in a Given, When, Then format: a starting condition, an event or action, and an expected result. The format keeps attention on conditions, events and actions that can be verified by a test.
Why the other options are wrong:
- B. The user need and expected value are the focus of the user story format, not of the scenario format.
- C. Aligning iterations with user concerns is a planning matter, not what the scenario format does.
- D. Layers of modernist analysis is not an agile analysis concept.
Question 45
The organization has a history of delivering products that often don’t resonate with potential customers. After some discussion, the team decides to address this challenge by developing:
- A. Metrics and KPIs
- B. Personas
- C. Project plan
- D. Customer call center
Show answer and explanation ▾
Correct answer: B
Personas are fictional characters built from research that represent the types of people who will use a product, with their goals, behaviors and frustrations. They help a team design for real customers, which is what products that fail to resonate are missing.
Why the other options are wrong:
- A. Metrics and KPIs measure performance but do not build an understanding of who the customers are.
- C. A project plan schedules work and says nothing about customers.
- D. A customer call center handles support after delivery and does not shape the product.
Question 46
The organization’s decision to start a new initiative should always be based on:
- A. Market assumptions
- B. Evidence
- C. Past initiative goals
- D. Staff experience
Show answer and explanation ▾
Correct answer: B
Agile analysis is empirical, so decisions are made on what has been observed and learned. Starting a new initiative commits significant resources, and that decision should rest on evidence that the need is real and worth satisfying.
Why the other options are wrong:
- A. Market assumptions are untested and need to be validated before they justify an initiative.
- C. Goals of past initiatives do not show that a new need is worth satisfying.
- D. Staff experience is opinion and does not replace evidence.
Question 47
A team discussion focuses on six key terms. These six terms have a common meaning and are used to discuss both business analysis and its relationship with common terminology. These terms are described in the:
- A. Strategic Plan
- B. Business Analysis Core Concept Model
- C. Business Analysis Scope Model
- D. Stakeholder Map
Show answer and explanation ▾
Correct answer: B
The Business Analysis Core Concept Model defines six terms with a common meaning for all business analysis work: change, need, solution, stakeholder, value and context.
Why the other options are wrong:
- A. A strategic plan sets an organization's direction and does not define these six terms.
- C. Business Analysis Scope Model is not the name of the framework that defines these terms.
- D. A stakeholder map shows stakeholders and their relationships and does not define these six terms.
Question 48
The team agrees that the agile business analysis principle of “see the whole” aligns with the BACCM core concept of:
- A. Value
- B. Stakeholder
- C. Needs
- D. Context
Show answer and explanation ▾
Correct answer: D
See the whole means analyzing a need with a view of the full circumstances around it. In the Business Analysis Core Concept Model, context is the circumstances that influence, are influenced by and provide understanding of the change.
Why the other options are wrong:
- A. Value is the worth of something to a stakeholder, not the circumstances that surround the change.
- B. Stakeholder is a group or individual with a relationship to the change, not the circumstances that surround it.
- C. Need is a problem or opportunity to be addressed, not the circumstances that surround the change.
Question 49
When recommending solution options at the Initiative Horizon, the team decides that their goal is to provide decision makers with:
- A. The exact cost and timeframe options will take to complete
- B. Just enough information to make an informed and accurate decision
- C. The list of stakeholders that are allowed to have input
- D. Everything known about the resource team doing the delivery
Show answer and explanation ▾
Correct answer: B
Agile analysis produces just enough information, just in time. A solution recommendation at the Initiative Horizon should give decision makers what they need to make an informed and accurate decision, and no more.
Why the other options are wrong:
- A. Exact cost and time frames cannot be known at this stage, so estimates are used.
- C. A list of stakeholders allowed to give input does not help decision makers choose a solution.
- D. Everything known about the delivery team is more information than the decision needs.
Question 50
Strategic decision makers are considering large amounts of complex information covering many different areas. To reduce the information to a manageable level of complexity, they decide to use the following:
- A. Reduction
- B. MoSCoW approach
- C. Models
- D. Filtering
Show answer and explanation ▾
Correct answer: C
Models are simplified representations of a complex reality. They let strategic decision makers reduce large amounts of information across many areas to a level they can reason about and discuss.
Why the other options are wrong:
- A. Reduction is not an agile analysis technique.
- B. The MoSCoW approach prioritizes requirements and does not simplify complex information.
- D. Filtering is not the technique used to make complex information manageable for decision makers.
Question 51
The product owner has found the overall goals of an initiative need to change and discusses the revisions with the team. The estimate of the revised work is greater than the original, which will likely cause the team to miss the fixed release date. The team works actively together to understand the new information about what is valuable and what is not, and find ways to eliminate work that does not directly relate to the newly expressed value. The team is demonstrating which agile value?
- A. Contract negotiation
- B. Customer collaboration
- C. Comprehensive documentation
- D. Processes and tools
Show answer and explanation ▾
Correct answer: B
Customer collaboration means working with the customer as their understanding of value changes instead of holding to the original agreement. The team works with the product owner to understand the new goals and remove work that no longer serves them.
Why the other options are wrong:
- A. Contract negotiation would mean holding the product owner to the original scope.
- C. Comprehensive documentation is the item agile values less than working solutions and plays no part here.
- D. Processes and tools are the item agile values less than individuals and interactions and play no part here.
Question 52
The team will be performing its first review and trying to determine what should be demonstrated. After a lengthy discussion they decide to demonstrate:
- A. Their response to critical customer feedback
- B. Key lines of code that describe the solution
- C. Slides of screens to be developed
- D. An increment of the working solution
Show answer and explanation ▾
Correct answer: D
A review exists to show stakeholders what has actually been built and gather their feedback on it. The team demonstrates an increment of the working solution, because working product is the real measure of progress.
Why the other options are wrong:
- A. A response to feedback is not what a review demonstrates, since a review shows working product.
- B. Lines of code mean little to stakeholders and do not show working behavior.
- C. Slides of screens yet to be developed are not a working solution.
Question 53
The team is making important decisions when assessing the initiative they are working on. Feedback received from the Delivery Horizon informs:
- A. Priority and sequencing of solution components
- B. Identification of reporting requirements
- C. Suggestions for team process continuous improvement
- D. How to build the required solution components
Show answer and explanation ▾
Correct answer: A
Feedback from the Delivery Horizon tells the Initiative Horizon how delivered components are performing and what the team has learned. That learning is used to adjust the priority and sequencing of the remaining solution components.
Why the other options are wrong:
- B. Identifying reporting requirements is not what delivery feedback informs at the initiative level.
- C. Team process improvement is handled within the delivery team through retrospectives.
- D. How to build components is decided by the delivery team at the Delivery Horizon.
Question 54
The team realizes it is important that solution components are analyzed:
- A. In great detail so as much information as possible is available for subsequent work
- B. To provide answers to any potential questions from senior management
- C. So enough information is available to meet all stakeholder needs
- D. To a level of precision that is just enough to make an informed next decision
Show answer and explanation ▾
Correct answer: D
Agile analysis is done just in time and to just enough precision. Solution components are analyzed only to the level needed to make the next decision well, and further detail is added when it is needed.
Why the other options are wrong:
- A. Analyzing in great detail early is waste, because much of it changes or is never used.
- B. Preparing answers for any possible management question is speculative work that adds no value.
- C. Meeting all stakeholder needs is not the test for how far to analyze a component.
Question 55
All team members participate at a review of their delivery process for the past 2 weeks. They consider issues, both pro and con, that influenced how much the team got done, as well as what they can do to make that better. This meeting is an example of the principle:
- A. Understand what is doable
- B. Iteration and progression
- C. Avoid Waste
- D. Stimulate collaboration and continuous improvement
Show answer and explanation ▾
Correct answer: D
A meeting where the whole team looks back at what helped and hindered the last two weeks and agrees how to do better is a retrospective. It applies the principle of stimulating collaboration and continuous improvement.
Why the other options are wrong:
- A. Understand what is doable concerns what can be delivered within constraints, not reviewing how the team works.
- B. Iteration and progression is not one of the agile analysis principles.
- C. Avoid waste concerns removing work that adds no value, not a whole team look back at its process.
Question 56
When the product owner determines there has been enough value delivered on the initiative to satisfy the need, then the sponsor’s immediate next step is to:
- A. Cancel future work on the initiative to avoid waste
- B. Start work on the list of enhancements to improve the delivered product
- C. Hold individual interviews to collect feedback
- D. Dive deeper into the next delivery cycle’s stories
Show answer and explanation ▾
Correct answer: D
A finding that enough value has been delivered is an input to the sponsor, not an automatic end to the work. The sponsor's next step is to look more closely at the stories planned for the next delivery cycle before deciding how to proceed.
Why the other options are wrong:
- A. Cancelling future work is not the sponsor's immediate next step.
- B. Starting on enhancements adds work after the need has been satisfied.
- C. Individual interviews are a slow way to gather feedback and are not the sponsor's next step.
Question 57
A team member has written a full user guide about a feature that has not yet been developed. Shortly before delivery is to start, the feature is dropped.
What did the team member forget to value highly?
- A. Following the plan
- B. Detailed processes
- C. Fixed iterations
- D. Working solutions
Show answer and explanation ▾
Correct answer: D
Agile values working solutions over comprehensive documentation. Writing a full user guide for a feature that does not exist yet put documentation first, and the effort was lost when the feature was dropped.
Why the other options are wrong:
- A. Following a plan is the item agile values less than responding to change.
- B. Detailed processes are not something agile asks a team to value highly.
- C. Fixed iterations are a delivery practice, not a value the team member overlooked.
Question 58
The team is discussing one of the six key terms used to discuss both business analysis and its relationship with common terminology.
Specifically, they are discussing a specific way of satisfying one or more needs in a context. This team is discussing the:
- A. Plan
- B. Need
- C. Value
- D. Solution
Show answer and explanation ▾
Correct answer: D
In the Business Analysis Core Concept Model, a solution is a specific way of satisfying one or more needs in a context.
Why the other options are wrong:
- A. Plan is not one of the six core concepts.
- B. Need is a problem or opportunity to be addressed.
- C. Value is the worth, importance or usefulness of something to a stakeholder within a context.
Question 59
During a planning workshop, the team is discussing: “What outcomes are we driving now?” This team is operating at the:
- A. Retrospective event
- B. Testing phase
- C. Initiative horizon
- D. Goals horizon
Show answer and explanation ▾
Correct answer: C
The Initiative Horizon sits between strategy and delivery and deals with the outcomes a current initiative is meant to produce and the solution options for reaching them. A team asking which outcomes it is driving now is working at this level.
Why the other options are wrong:
- A. A retrospective looks back at how the team worked, not at the outcomes being driven.
- B. Testing phase is not a planning horizon.
- D. Goals horizon is not one of the three planning horizons.
Question 60
The team is assessing feedback from the work that’s been completed. After some discussion they realize this feedback can be used to assess the remaining components that are yet to be built. Specifically, this feedback can be used to help them determine if the initiative’s remaining solution components are:
- A. Impacting other initiatives
- B. Supported by management
- C. Likely to be completed
- D. Still appropriate
Show answer and explanation ▾
Correct answer: D
Feedback on completed work shows how well the need is being met and what has been learned. The team uses it to judge whether the solution components still to be built remain appropriate, or should be changed, reordered or removed.
Why the other options are wrong:
- A. Impact on other initiatives is not what feedback from completed work tells the team about remaining components.
- B. Management support is not determined from feedback on completed work.
- C. Likelihood of completion is a capacity question, not what this feedback is used to assess.
Question 61
Agile business analysis focuses on producing something, showing it to stakeholders, and eliciting immediate feedback. This demonstrates the following characteristic of working in an agile context:
- A. Systems approach
- B. Focused nature
- C. Empirical nature
- D. Planned approach
Show answer and explanation ▾
Correct answer: C
Empirical means learning from observation and experience. Producing something, showing it to stakeholders and acting on their immediate feedback is how agile work bases decisions on what is actually observed.
Why the other options are wrong:
- A. A systems approach looks at how parts of a whole interact, not at learning from feedback on delivered work.
- B. Focused nature is not the characteristic that describes learning from stakeholder feedback.
- D. A planned approach follows decisions made upfront instead of learning from feedback.
Question 62
Wanting to ensure the delivery team is working as productively as possible, they decide backlog items, including user stories, should be:
- A. Fully detailed before they get prioritized
- B. Refined and elaborated by the Tech Lead
- C. Refined and elaborated throughout the planning horizons
- D. Fully detailed as they enter the backlog
Show answer and explanation ▾
Correct answer: C
Backlog items start broad and gain detail as they move closer to delivery. Refining and elaborating them progressively across the planning horizons avoids wasted analysis on items that may change or never be built.
Why the other options are wrong:
- A. Fully detailing items before they are prioritized wastes effort on items that may never be built.
- B. Refinement is a collaborative team activity, not the job of the Tech Lead alone.
- D. Fully detailing items as they enter the backlog is upfront analysis that agile avoids.
Question 63
Backlog items that are dependent on other backlog items compromise and limit rapid decision making, fast delivery and strategic alignment by not leveraging:
- A. Feedback loops
- B. Daily standups
- C. Retrospectives
- D. Thinking like a customer
Show answer and explanation ▾
Correct answer: A
Independent backlog items can be delivered and assessed on their own, which gives fast feedback to every horizon. Items that depend on other items cannot be delivered separately, so the feedback loops that drive quick decisions and alignment are not used.
Why the other options are wrong:
- B. Daily standups coordinate the team's work and are not what dependent items fail to leverage.
- C. Retrospectives improve the team's process and are not what dependent items fail to leverage.
- D. Thinking like a customer is a principle about perspective and is not what dependent items fail to leverage.
Question 64
The delivery team is discussing how to achieve the strategic goals for their work. They determine the following analysis technique is important to help the team maintain its focus:
- A. Relative estimation
- B. Spikes
- C. Story elaboration
- D. Visioning
Show answer and explanation ▾
Correct answer: D
Visioning produces a shared statement of the purpose and desired outcome of the work. The delivery team uses that vision as a reference point to keep day to day decisions aligned with the strategic goals.
Why the other options are wrong:
- A. Relative estimation sizes backlog items against each other and does not connect work to strategic goals.
- B. Spikes are short investigations to reduce uncertainty and do not connect work to strategic goals.
- C. Story elaboration adds detail to individual stories and does not connect work to strategic goals.
Question 65
The delivery team discusses how to maintain the integrity of their backlog items. They decide to?
- A. Delay changes until they are caught up
- B. Develop a business case for all changes
- C. Monitor stories and features for staleness
- D. Ensure all changes are approved
Show answer and explanation ▾
Correct answer: C
A backlog is only useful if its items still reflect current needs. Monitoring stories and features for staleness lets the team update or remove items that have been overtaken by change.
Why the other options are wrong:
- A. Delaying changes leaves the backlog out of date.
- B. A business case for every change is heavy process that slows the team's response to change.
- D. Requiring approval for all changes is heavy process that slows the team's response to change.
Question 66
While working at the Strategy Horizon, one of the key decisions to make upfront is:
- A. Is a need worth satisfying?
- B. What features should we deliver?
- C. Have we delivered enough value?
- D. Should we cancel the work?
Show answer and explanation ▾
Correct answer: A
Analysis at the Strategy Horizon looks across the whole organization to decide which needs deserve investment. Before any initiative is started or funded, decision makers first judge whether a need is worth satisfying, and that choice shapes everything decided at the lower horizons.
Why the other options are wrong:
- B. Choosing the features to deliver is a decision made closer to the work, at the Initiative Horizon, once a need has already been accepted.
- C. Judging whether enough value has been delivered happens after delivery has produced results, so it is not a decision made upfront.
- D. Canceling work can only be considered once work is under way and feedback has come in, so it is not an upfront decision.
That was 66 of 170.
The full IIBA AAC pack has all 170 questions, each with the answer, the explanation and why the other options are wrong, plus a questions-only copy for timed runs. $39.00 USD, paid once, with free monthly updates and a pass-or-your-money-back guarantee.
Get the full packNot ready yet? Get the first 66 free as one PDF by email. Get the Half Pack →
About the AAC exam
These 66 IIBA AAC questions are free here, and as a free PDF by email.
They are drawn from the same bank as the full AAC pack, which has 170 questions in total.