Hitachi Vantara HQT-4160 Practice Questions with Explanations

Free Hitachi Vantara HQT-4160 practice questions. 12 of them, each with the correct answer, a full explanation, and the reason every other option is wrong.

HQT-4160 practice questions

Question 1

A customer wants to upgrade a diskless VSP 5100 to a VSP 5500.

Which three types of components will be added during the upgrade? (Choose three.)

  • A. Controllers (CTLs)
  • B. Interconnect Switches (ISWs)
  • C. Channel Boards (CHBs)
  • D. Hitachi Interconnect Edges (HIEs)
  • E. Hitachi Service and Network Box (HSNBX)
Show answer and explanation ▾

Correct answer: A, B, C

A VSP 5500 has more controllers than a VSP 5100, so the upgrade adds controllers. Channel boards and interconnect switches are the other two component types added with them.

Why the other options are wrong:

  • D. Hitachi Interconnect Edges are not one of the three component types added in this upgrade.
  • E. The Hitachi Service and Network Box is not one of the three component types added in this upgrade.

Question 2

Which two components are different between VSP 5500 and VSP 5600 systems? (Choose two.)

  • A. Interconnect Switch (ISW)
  • B. Controller Board
  • C. Hitachi Interconnect Edge (HIE)
  • D. DKC Power Supply (DKCPS)
Show answer and explanation ▾

Correct answer: B, D

The 5600 uses newer controller boards and a different DKC power supply than the 5500, while the interconnect parts stay the same.

Why the other options are wrong:

  • A. The interconnect switch is shared between the two models.
  • C. The interconnect edge is shared between the two models.

Question 3

Which three statements are correct regarding the cache configuration of VSP 5000 systems with two controller boxes (CBX)? (Choose three.)

  • A. All the DIMMs must be of the same type.
  • B. CMG0 or CMG1 can be used as default cache.
  • C. CMG0 must be used as default and CMG1 is optional.
  • D. The cache only support 128 GB DIMMs.
  • E. Each controller pair (CTL1-CTL1, CTL2-CTL2) must have the same cache capacity.
Show answer and explanation ▾

Correct answer: A, C, E

DIMMs must match in type, CMG0 is the required default cache with CMG1 optional, and paired controllers must hold equal cache capacity.

Why the other options are wrong:

  • B. CMG0 must be the default cache. CMG1 cannot take its place.
  • D. Cache is not limited to 128 GB DIMMs.

Question 4

A VSP 5500 system is installed with a pair of Controller Boxes (CBXs).

How many LAN cables are needed to attach controllers to the switch/HUB located on the Hitachi Service and Network Box-0 (HSNBX-0)?

  • A. 2
  • B. 4
  • C. 6
  • D. 8
Show answer and explanation ▾

Correct answer: A

Two LAN cables attach the controllers of a CBX pair to the switch/HUB on HSNBX-0.

Why the other options are wrong:

  • B. Four is not the number of LAN cables that run from a CBX pair to the hub on HSNBX-0.
  • C. Six is not the number of LAN cables that run from a CBX pair to the hub on HSNBX-0.
  • D. Eight is not the number of LAN cables that run from a CBX pair to the hub on HSNBX-0.

Question 5

How many Accelerator Compression Modules are installed in a VSP 5600?

  • A. three per controller
  • B. two per CBX
  • C. two per controller
  • D. two per system
Show answer and explanation ▾

Correct answer: C

Each controller in a VSP 5600 is fitted with two compression accelerator modules, which offload data compression from the processors. The total in a system therefore grows with the number of controllers.

Why the other options are wrong:

  • A. Each controller holds two of these modules, not three.
  • B. The count is two for each controller, and a CBX holds more than one controller.
  • D. The count is two for each controller, not two for the whole system.

Question 6

Which three Channel Board (CHB) protocols are supported on a VSP 5000 system? (Choose three.)

  • A. iSCSI
  • B. FICON
  • C. SCSI
  • D. FC
  • E. Wide SCSI
Show answer and explanation ▾

Correct answer: A, B, D

VSP 5000 channel boards connect hosts over Fibre Channel, iSCSI and IBM FICON for mainframes. These are the host interface types the series offers.

Why the other options are wrong:

  • C. Parallel SCSI is not a host interface type offered on VSP 5000 channel boards.
  • E. Wide SCSI is not a host interface type offered on VSP 5000 channel boards.

Question 7

How many Channel Boards (CHBs) can be installed in a VSP 5600 with two CBX?

  • A. 8
  • B. 12
  • C. 16
  • D. 24
Show answer and explanation ▾

Correct answer: C

Each controller accepts up to four channel boards. A VSP 5600 with two CBXs has four controllers, which gives a maximum of 16 channel boards.

Why the other options are wrong:

  • A. Eight is half of the maximum for four controllers.
  • B. Twelve is not the maximum for a VSP 5600 with two CBXs.
  • D. Twenty-four is more than four controllers can hold.

Question 8

Which two statements are true about the spare drive in a VSP 5000 system? (Choose two.)

  • A. Only slot 11 and slot 23 of DBS2 can be used as spare.
  • B. The customer can decide which slot is to be used for the spare drive.
  • C. If one of the slot 11 of the SBX is used as spare, the 3 remaining slots 11 could only be used as spare.
  • D. The VSP 5000 system will allocate a spare slot automatically if "Spare slot allocation" is set to "Variable" at installation time.
Show answer and explanation ▾

Correct answer: B, D

Spare drives on a VSP 5000 are not tied to fixed slots: the customer can decide which slot holds a spare. When Spare slot allocation is set to Variable at installation time, the system allocates a spare slot automatically.

Why the other options are wrong:

  • A. Spare drives are not restricted to slot 11 and slot 23 of the drive box.
  • C. Using one slot 11 as a spare does not reserve the other slot 11 positions for spares.

Question 9

Which three RAID Group configurations are supported on a VSP 5000 system? (Choose three.)

  • A. RAID1 (2D+2D)
  • B. RAID5 (4D+1P)
  • C. RAID5 (7D+1P)
  • D. RAID6 (6D+2P)
  • E. RAID6 (7D+2P)
Show answer and explanation ▾

Correct answer: A, C, D

The VSP 5000 series supports RAID 1 as 2D+2D or 4D+4D, RAID 5 as 3D+1P or 7D+1P, and RAID 6 as 6D+2P or 14D+2P. RAID1 (2D+2D), RAID5 (7D+1P) and RAID6 (6D+2P) are all on that list.

Why the other options are wrong:

  • B. RAID 5 is offered as 3D+1P or 7D+1P, and 4D+1P is not a supported layout.
  • E. RAID 6 is offered as 6D+2P or 14D+2P, and 7D+2P is not a supported layout.

Question 10

Which two statements are correct regarding the "New Installation" procedure on a VSP 5000 system? (Choose two.)

  • A. You can perform the "New Installation" procedure if a newly installed system does not power on and the Hitachi Vantara Technical Support instructs you to do so.
  • B. Customer Engineers (CEs) should always perform the "New Installation" procedure when a new unit arrives at customer site.
  • C. Hitachi Vantara recommends not to perform the "New Installation" procedure on second-hand systems.
  • D. A customer can make a request to Hitachi Vantara Technical Support for a "New Installation" procedure, if they want to reinitialize a system entirely so all former data will be erased.
Show answer and explanation ▾

Correct answer: C, D

The New Installation procedure reinitializes the whole system, so all former data is erased. A customer who wants that can request it from Hitachi Vantara Technical Support, and Hitachi Vantara recommends not performing the procedure on second-hand systems.

Why the other options are wrong:

  • A. A newly installed system that does not power on is not a case for the New Installation procedure.
  • B. The New Installation procedure is not a routine step performed on every new unit that arrives at a customer site.

Question 11

How many IP addresses should you configure to integrate a VSP 5000 series storage system on the customer public network?

  • A. 0
  • B. 1
  • C. 2
  • D. 3
Show answer and explanation ▾

Correct answer: C

Two IP addresses are configured to integrate a VSP 5000 series storage system on the customer public network.

Why the other options are wrong:

  • A. The system must be reachable on the customer network, so it cannot be integrated with no address.
  • B. One address is not enough: two are configured.
  • D. Three addresses are not needed: two are configured.

Question 12

Which two steps should you perform before a VSP 5000 system installation? (Choose two.)

  • A. Use the Maintenance manual to check any power and environmental requirements.
  • B. Use the Administrator manual to provide the customer with a list of suitable IP addresses for their public network.
  • C. Ensure you have a Windows laptop configured as Maintenance laptop prior to the installation.
  • D. Ensure that you have the 3 CE jumpers required to configure the system.
Show answer and explanation ▾

Correct answer: A, C

Before installation, the Maintenance manual is used to check that the site meets the power and environmental requirements. A Windows laptop must also be set up in advance as the Maintenance laptop, because it is the tool used to connect to and configure the system.

Why the other options are wrong:

  • B. The customer chooses and supplies the IP addresses for their own public network.
  • D. Having three CE jumpers is not one of the preparation steps for this installation.

That was 12 of 35.

The full Hitachi Vantara HQT-4160 pack has all 35 questions, each with the answer, the explanation and why the other options are wrong, plus a questions-only copy for timed runs. $39.00 USD, paid once, with free monthly updates and a pass-or-your-money-back guarantee.

Get the full pack

Not ready yet? Get the first 12 free as one PDF by email. Get the Half Pack →

About the HQT-4160 exam

These 12 Hitachi Vantara HQT-4160 questions are free here, and as a free PDF by email.

They are drawn from the same bank as the full HQT-4160 pack, which has 35 questions in total.

Back to blog