BICSI RCDD Practice Questions with Explanations
Free BICSI RCDD practice questions. 60 of them, each with the correct answer, a full explanation, and the reason every other option is wrong.
RCDD practice questions
Question 1
An ICT distribution designer working for the owner receives a submitted product that differs from the product specified in the contract documents.
The original product is unavailable due to shipping or manufacturing delay.
Which action should the ICT distribution designer take?
- A. Reject the submittal after verifying compliance with applicable standards.
- B. Approve the submittal after asking about additional compensating warranty offerings.
- C. Approve the submittal after verifying code compliance.
- D. Approve the submittal after verifying all significant features of the originally specified product are met.
Show answer and explanation ▾
Correct answer: C
A substitute product must comply with the applicable codes before it can be installed. When the specified product is unavailable, the designer verifies code compliance of the submitted product before approving the submittal.
Why the other options are wrong:
- A. Rejecting the submittal leaves the project without an available product while the specified one cannot be supplied.
- B. Extra warranty offerings do not show that the substitute is acceptable to install.
- D. A feature comparison alone does not confirm that the substitute may be installed.
Question 2
What is a simplified cone of protection for lightning strikes as it pertains to a structure (building, pole, etc.)?
- A. 43 m (140 ft)
- B. A base diameter equal to the height of the structure
- C. A base radius equal to the height of the structure
- D. 50% of the height of the structure in any direction
Show answer and explanation ▾
Correct answer: C
The simplified cone of protection is drawn from the top of the structure down to the ground, with a base radius equal to the height of the structure. Objects inside that cone are considered shielded from direct strikes.
Why the other options are wrong:
- A. A fixed distance of 43 m (140 ft) does not scale with the height of the structure.
- B. A base diameter equal to the height would give a cone only half as wide as the simplified rule.
- D. Half the height in any direction understates the zone given by the simplified cone.
Question 3
When sizing an underground entrance facility, what is the MINIMUM amount of 103 metric designator conduits (4 trade size) that should be specified by the ICT distribution designer?
- A. 2 Conduits
- B. 3 Conduits
- C. 4 Conduits
- D. 6 Conduits
Show answer and explanation ▾
Correct answer: C
When sizing an underground entrance facility, the designer should specify a minimum of four 103 metric designator (4 trade size) conduits.
Why the other options are wrong:
- A. Two conduits is below the minimum quantity for an underground entrance.
- B. Three conduits is below the minimum quantity for an underground entrance.
- D. Six conduits is more than the stated minimum.
Question 4
66-style connecting blocks (certain designs) can support up to what category of transmission performance?
- A. Category 3
- B. Category 5
- C. Category 5e
- D. Category 6
- E. Category 6A
Show answer and explanation ▾
Correct answer: C
Certain designs of 66-style connecting blocks are rated to support transmission performance up to category 5e. Higher categories call for other connecting hardware such as 110-style blocks or modular patch panels.
Why the other options are wrong:
- A. Category 3 is supported by 66-style blocks but is not the highest category certain designs reach.
- B. Category 5 is below the highest performance that certain 66-style designs support.
- D. Category 6 is beyond what 66-style blocks are stated to support.
- E. Category 6A is beyond what 66-style blocks are stated to support.
Question 5
Open RFI’s should be reviewed on a __________ basis.
- A. daily
- B. bi-weekly
- C. weekly
- D. bi-monthly
Show answer and explanation ▾
Correct answer: C
Open requests for information should be reviewed weekly so that unanswered questions are followed up before they delay the work or affect the schedule.
Why the other options are wrong:
- A. A daily review is more frequent than the stated practice for open RFIs.
- B. A bi-weekly review lets open RFIs sit too long.
- D. A bi-monthly review lets open RFIs sit far too long.
Question 6
Which two of the following apply during a project’s close out process? (Choose two.)
- A. Communicate discrepancies to responsible parties.
- B. Begin testing of installed infrastructure.
- C. Evaluate the surroundings of the project and report back to the communications distribution professional of these findings.
- D. Hire legal council for representation.
- E. Create schedule for completion of punch list.
Show answer and explanation ▾
Correct answer: A, E
During closeout the designer inspects the finished work, communicates any discrepancies to the parties responsible for correcting them, and sets a schedule for completing the punch list so the project can be accepted.
Why the other options are wrong:
- B. Testing of the installed infrastructure begins during construction, not at closeout.
- C. Evaluating the surroundings of the project is a site survey activity done early in the project.
- D. Hiring legal counsel is not a closeout step.
Question 7
Telecommunications cabling (e.g., voice, data, video, security, audio, control) can be damaged during the construction phases of rough-in, drywall installation, and during the siding of the exterior. For these reasons, telecommunications cabling shall be acceptance tested. Acceptance testing includes visual examination and verification of all cabling and qualification of copper cabling for data cabling or certification of copper or optical fiber cabling for data cabling. Verification testing is generally performed in which two of the following steps? (Choose two.)
- A. Post the acceptance of the construction contract once the Project Manager has approved this phase
- B. Prior to the installation of insulation and drywall
- C. Prior to the installation of the cable tray system for spurs, points that would or could damage the cable infrastructure
- D. During the trim-out stage of the cabling after painting
- E. Post the implementation of the construction
Show answer and explanation ▾
Correct answer: B, D
Verification testing is generally done twice: at rough-in, before insulation and drywall cover the cables, and again at trim-out after painting, when the outlets are terminated. This catches damage while the cabling can still be reached and confirms the finished installation.
Why the other options are wrong:
- A. Acceptance of the construction contract is not a stage at which verification testing is performed.
- C. Testing cannot take place before the pathways and cabling are installed.
- E. Waiting until construction is fully complete makes damaged cable difficult to reach and replace.
Question 8
To properly size and provide accurate cost estimates for a communications distribution horizontal pathway that will include BAS system infrastructure, the designer should provide ________ for every BAS outlet or device based on total floor area.
- A. 9.30 m2 (100 ft2)
- B. 23.20 m2 (250 ft2)
- C. 91.40 m2 (300 ft2)
- D. 152.40 m2 (500 ft2)
Show answer and explanation ▾
Correct answer: B
For planning and cost estimating, building automation system cabling is sized on one BAS outlet or device for every 23.20 m2 (250 ft2) of floor area. This coverage area is larger than the area used for a typical work area.
Why the other options are wrong:
- A. 9.30 m2 (100 ft2) is the planning figure for an individual work area, not a BAS coverage area.
- C. This figure is not the BAS coverage area used for sizing.
- D. This figure is not the BAS coverage area used for sizing.
Question 9
Which of the following is the process of limiting fire and smoke using fire-resistive barriers?
- A. Suppression
- B. Prevention
- C. Compartmentation
- D. Detection
Show answer and explanation ▾
Correct answer: C
Compartmentation divides a building into areas enclosed by fire-resistive barriers such as rated walls and floors, which limits the spread of fire and smoke. Firestopping of cable penetrations exists to keep those barriers intact.
Why the other options are wrong:
- A. Suppression puts a fire out, for example with sprinklers.
- B. Prevention reduces the chance of a fire starting.
- D. Detection senses a fire and raises an alarm.
Question 10
An ICT distribution designer is providing labeling for a data center room number 2A, located on the second floor having 10 rows of cabinets.
Which of the following identifiers/labels would the designer attach to the bonding and grounding conductor between the first cabinet in the 6th row and the data center ground bar?
- A. 2A/R601.1
- B. 2A-SBB/R601.1
- C. 2/R6
- D. TEF1/R601.1
Show answer and explanation ▾
Correct answer: B
A bonding conductor is identified by the two ends it joins. The identifier 2A-SBB/R601.1 names the bonding busbar in room 2A at one end and the bonded cabinet in row 6 at the other.
Why the other options are wrong:
- A. This label names the room but not the busbar where the conductor terminates.
- C. This label names neither the busbar nor the specific cabinet.
- D. This label does not name the busbar in room 2A.
Question 11
Placement of a buried OSP pathway in public Rights of Way may require a permit based on which of the following?
- A. Locating of other utilities
- B. Bonding and grounding of metallic conductors
- C. Fees calculated on distance
- D. Building entrance conduit plugging
Show answer and explanation ▾
Correct answer: A
Work in a public right of way is controlled because other utilities already occupy it. Before a buried pathway is placed, existing utilities must be located, and the permit process is tied to that requirement.
Why the other options are wrong:
- B. Bonding and grounding of metallic conductors is a design requirement, not the basis for a right of way permit.
- C. Distance-based fees are not the basis on which a permit is required.
- D. Plugging of building entrance conduits takes place at the building, not in the public right of way.
Question 12
What is the FIRST step in quality evolution (focused on physical quality) when developing a quality plan?
- A. Qualitative risk analysis
- B. Client satisfaction
- C. Conformance
- D. Client value
- E. Quantitative risk analysis
Show answer and explanation ▾
Correct answer: D
A quality plan is built around what the client values in the finished physical work, so client value is identified as the first step in quality evolution.
Why the other options are wrong:
- A. Qualitative risk analysis belongs to risk management, not quality evolution.
- B. Client satisfaction is not the first step identified in quality evolution.
- C. Conformance is not the first step identified in quality evolution.
- E. Quantitative risk analysis belongs to risk management, not quality evolution.
Question 13
What’s the RECOMMENDED twisted pair cable slack length to be left at the work area outlet location to enable the possibility of future changes in the Horizontal Cabling System?
- A. ≈ 0.152 m (0.5 ft)
- B. ≈ 0.3 m (1 ft)
- C. ≈ 1 m (3 ft)
- D. ≈ 5 m (16.40 ft)
Show answer and explanation ▾
Correct answer: B
About 0.3 m (1 ft) of twisted-pair cable slack is recommended at the work area outlet. That is enough to reterminate or reposition the outlet later without storing excess cable in the box.
Why the other options are wrong:
- A. About 0.152 m (0.5 ft) is less than the recommended slack for twisted-pair cable.
- C. About 1 m (3 ft) is the slack recommended for optical fiber, not twisted-pair cable.
- D. About 5 m (16.40 ft) is far more slack than an outlet location can hold.
Question 14
During bidding the ICT distribution designer should review the bid responses for compliance and completeness. Afterwards, the designer should report the findings and recommendations to the _______
- A. technical consultant.
- B. legal counsel.
- C. stakeholders.
- D. construction foreman.
Show answer and explanation ▾
Correct answer: C
After checking bid responses for compliance and completeness, the designer reports the findings and recommendations to the stakeholders, who hold the authority to select the bidder and award the contract.
Why the other options are wrong:
- A. A technical consultant does not make the award decision.
- B. Legal counsel advises on contract terms but does not receive the bid evaluation for award.
- D. A construction foreman has no role in evaluating or awarding bids.
Question 15
Using an earth ground resistance tester, what is the recommended MAXIMUM value for resistance between any two points along the entire length of a bonding or grounding conductor (not including the earth electrode system)?
- A. 0.10 ohm
- B. 0.25 ohm
- C. 0.50 ohm
- D. 1 ohm
- E. 2 ohms
Show answer and explanation ▾
Correct answer: D
When an earth ground resistance tester is used to check a bonding or grounding conductor, the recommended maximum resistance between any two points along its length is 1 ohm, not counting the earth electrode system.
Why the other options are wrong:
- A. 0.10 ohm is not the recommended maximum stated for this test.
- B. 0.25 ohm is not the recommended maximum stated for this test.
- C. 0.50 ohm is not the recommended maximum stated for this test.
- E. 2 ohms exceeds the recommended maximum.
Question 16
Which of the following is a method that an ICT distribution designer would use for clash detection with other disciplines?
- A. Statistical Quantitative Analysis
- B. Interference Fit Verification
- C. ICT pathway design
- D. Building Information Modeling Coordination
Show answer and explanation ▾
Correct answer: D
Building information modeling coordination combines the 3D models of every discipline so that software can find clashes, such as a cable tray running through a duct or beam, before construction begins.
Why the other options are wrong:
- A. Statistical quantitative analysis is not a method for finding physical conflicts between disciplines.
- B. Interference fit verification is a mechanical engineering term, not a building coordination method.
- C. ICT pathway design produces the pathways but does not detect clashes with other disciplines.
Question 17
What is the MAIN concern with a poke-thru installation?
- A. The compatibility with the telecommunications outlet/connector
- B. The structural integrity of the floor assembly
- C. The fact that it is beneath the floor
- D. The diameter of the poke-thru device
Show answer and explanation ▾
Correct answer: B
A poke-thru device is installed in a hole cored through the floor slab, so the main concern is the structural integrity of the floor assembly. The number, size and spacing of cores must be approved by a structural engineer.
Why the other options are wrong:
- A. Compatibility with the outlet or connector is a product selection detail, not the main concern.
- C. Being fed from beneath the floor is how the device works, not the main concern.
- D. The device diameter matters only through its effect on the floor structure.
Question 18
What is used to facilitate MINOR changes to the Project Requirements?
- A. Change order
- B. Request for Information (RFI)
- C. Punch list
- D. Field order
- E. Change order request
Show answer and explanation ▾
Correct answer: D
A field order directs a minor change in the work that does not alter the contract price or schedule, so it can be issued quickly without the formal change order process.
Why the other options are wrong:
- A. A change order is the formal instrument for changes that affect cost or time.
- B. An RFI asks for clarification and does not change the requirements.
- C. A punch list records items still to be completed or corrected at closeout.
- E. A change order request starts the formal change process and is not used for minor changes.
Question 19
Which two of the following are included in the ICT distribution designer’s role of vendor and contractor coordination? (Choose two.)
- A. Produce ICT closeout documentation for the owner to provide the record documentation of the installation.
- B. Assist in the resolution of unforeseen conditions, change orders, RFIs, and changes to the project’s critical path.
- C. Monitor project schedule for delays.
- D. Communicate status to stakeholders.
- E. Conduct final ICT inspections to ensure standard and code compliance, design intent, and/or client requirements are met.
Show answer and explanation ▾
Correct answer: B, D
Vendor and contractor coordination means working with the installing parties as issues arise: helping to resolve unforeseen conditions, change orders, RFIs and changes to the critical path, and keeping stakeholders informed of status.
Why the other options are wrong:
- A. Producing closeout documentation belongs to project closeout.
- C. Monitoring the schedule for delays belongs to project schedule management.
- E. Conducting final inspections belongs to closeout and acceptance.
Question 20
In a contiguous property environment (e.g., where campus backbone cables exist), which two of the following are CRITICAL factors to understand for maintenance and growth purposes? (Choose two.)
- A. Cable composition
- B. Cost analysis of the value of capex and opex models
- C. Not able to determine the working capacity versus spare cable capacity
- D. Familiarity with the routes and spaces (proper record keeping)
- E. Fill ratio
Show answer and explanation ▾
Correct answer: A, D
To maintain and expand campus backbone cabling, the designer must know what each cable is made of, such as media type and pair or strand count, and must know the routes and spaces it uses, which depends on accurate records.
Why the other options are wrong:
- B. A capex and opex cost analysis is a financial exercise, not a factor in understanding the installed plant.
- C. Being unable to determine working versus spare capacity is a problem, not a factor to understand.
- E. Fill ratio is a pathway sizing figure, not one of the two critical factors named for campus backbone cables.
Question 21
A network that has a single broadcast domain is referred to as a ______ network.
- A. redundant
- B. segmented
- C. routed
- D. flat
- E. storage
Show answer and explanation ▾
Correct answer: D
A flat network has no routers or VLANs dividing it, so every device is in the same broadcast domain and receives every broadcast frame.
Why the other options are wrong:
- A. A redundant network has duplicate paths or equipment, which says nothing about broadcast domains.
- B. A segmented network is divided into several broadcast domains.
- C. A routed network uses routers, which separate broadcast domains.
- E. A storage network connects servers to storage devices.
Question 22
In addition to thoroughly knowing the national electrical, communications, safety and building codes, standards, and regulations for a particular project, what additional entities should the ICT distribution designer be seeking information and approval from? (Choose two.)
- A. Regional regulations
- B. General contractor
- C. Municipal codes
- D. Client contact
- E. Manufacturer
Show answer and explanation ▾
Correct answer: A, C
National codes and standards are often amended or supplemented locally, so the designer must also check regional regulations and municipal codes, which are enforced by the local authority having jurisdiction.
Why the other options are wrong:
- B. The general contractor builds the project and does not issue regulatory approvals.
- D. The client contact supplies project requirements, not regulatory approval.
- E. A manufacturer provides product instructions, not regulatory approval.
Question 23
Standard definition TV (SDTV) and high definition TV (HDTV) are both available in two resolution formats called
- A. interlaced scanning and matrix scanning.
- B. matrix scanning and progressive scanning.
- C. matrix scanning and vertical scanning.
- D. compressed and uncompressed scanning.
- E. interlaced scanning and progressive scanning.
Show answer and explanation ▾
Correct answer: E
Both SDTV and HDTV are offered in interlaced and progressive formats. Interlaced scanning draws the odd and even lines in alternate passes, while progressive scanning draws every line in each frame, which is what the i and p in 1080i and 720p stand for.
Why the other options are wrong:
- A. Matrix scanning is not a television scanning format.
- B. Matrix scanning is not a television scanning format.
- C. Neither matrix scanning nor vertical scanning is a television resolution format.
- D. Compression describes how the signal is encoded, not how the picture is scanned.
Question 24
What is the recommended MINIMUM setback for dirt (spoil) piles from the edge of an excavation (trench, pit, etc.)?
- A. 305 mm (12 in)
- B. 457 mm (18 in)
- C. 610 mm (24 in)
- D. 1 m (39 in)
- E. 1.20 m (42 in)
Show answer and explanation ▾
Correct answer: C
Spoil piles should be kept at least 610 mm (24 in) back from the edge of an excavation, so that loose material cannot fall in and the weight of the pile does not load the trench wall.
Why the other options are wrong:
- A. 305 mm (12 in) is closer than the recommended minimum setback.
- B. 457 mm (18 in) is closer than the recommended minimum setback.
- D. 1 m (39 in) is more than the recommended minimum.
- E. 1.20 m is more than the recommended minimum.
Question 25
An Ethernet passive optical network (EPON) uses an aggregation device called an optical line terminal (OLT). An OLT can support a MINIMUM of ______ subscribers per port using a passive optical splitter.
- A. 8
- B. 16
- C. 32
- D. 64
Show answer and explanation ▾
Correct answer: B
In an EPON, each optical line terminal port feeds a passive optical splitter that divides the signal among subscribers, and a port supports a minimum of 16 subscribers.
Why the other options are wrong:
- A. 8 is below the minimum number of subscribers an OLT port supports.
- C. 32 is above the stated minimum.
- D. 64 is above the stated minimum.
Question 26
In addition to providing for current occupant needs, the horizontal pathway system design shall allow for future growth of ___% unless otherwise specified by the client.
- A. 20
- B. 40
- C. 50
- D. 100
Show answer and explanation ▾
Correct answer: A
Horizontal pathways are sized for the current occupants plus 20 percent future growth unless the client specifies a different figure, so later additions do not require new pathways.
Why the other options are wrong:
- B. 40 percent is not the default growth allowance for horizontal pathways.
- C. 50 percent is not the default growth allowance for horizontal pathways.
- D. 100 percent is not the default growth allowance for horizontal pathways.
Question 27
Which of the following may be reviewed by an ICT distribution designer during procurement management?
- A. Existing technology systems
- B. Purchase order and packing slips/invoices and compare to approved submittal
- C. Time frames
- D. Anticipated growth and new technologies
Show answer and explanation ▾
Correct answer: B
During procurement the designer may check purchase orders, packing slips and invoices against the approved submittal, confirming that the materials ordered and delivered are the ones that were approved.
Why the other options are wrong:
- A. Existing technology systems are reviewed during needs assessment and site survey.
- C. Time frames are reviewed as part of schedule planning.
- D. Anticipated growth and new technologies are reviewed during needs assessment.
Question 28
An RFQ usually provides more detail than RFP in selecting material such as
- A. delivery date.
- B. mounting option.
- C. make.
- D. color.
Show answer and explanation ▾
Correct answer: D
A request for quote asks for a price on exactly defined items, so it describes the material in finer detail than a request for proposal, down to attributes such as color.
Why the other options are wrong:
- A. A delivery date is a schedule term, not a detail of the material itself.
- B. A mounting option is not the detail an RFQ is noted for adding.
- C. The make is not the detail an RFQ is noted for adding.
Question 29
A client hired an ICT distribution designer who is designing some additional capacity for a customer owned aerial outside plant.
Which of the following would be a PRIMARY consideration?
- A. Clearances will still be adequate with the added equipment.
- B. That all of the poles on the path are at least Class 3.
- C. Sufficient space exists to install additional guying if required.
- D. Utility coordination with public utilities verifies minimum inductive interference.
Show answer and explanation ▾
Correct answer: A
Adding cable or equipment to an existing pole line changes sag and the space taken on each pole, so the primary consideration is that the required clearances above ground and from other utilities are still met.
Why the other options are wrong:
- B. A blanket pole class is not the primary consideration when adding capacity.
- C. Space for extra guying is checked only where added loading calls for it.
- D. Inductive interference coordination is not the primary consideration for added capacity on a customer-owned line.
Question 30
An ICT distribution designer is reviewing a client’s site information (spaces and pathways) to determine network technology and equipment selection. This is referred to as a ______ design process.
- A. logical network
- B. top-down
- C. functional
- D. bottom-up
Show answer and explanation ▾
Correct answer: B
Working from the client's site information toward the selection of network technology and equipment is referred to as a top-down design process.
Why the other options are wrong:
- A. Logical network design defines addressing and topology rather than naming this overall process.
- C. Functional is not the term used for this design process.
- D. Bottom-up is not the term used for the process described.
Question 31
For a cable tray installed within an ER, the RECOMMENDED access headroom is
- A. ≈ 152 mm (6 in).
- B. ≈ 203 mm (8 in).
- C. ≈ 254 mm (10 in).
- D. ≈ 305 mm (12 in).
Show answer and explanation ▾
Correct answer: D
A cable tray in an equipment room should have about 305 mm (12 in) of access headroom above it, giving installers room to place and remove cables.
Why the other options are wrong:
- A. About 152 mm (6 in) is less than the recommended access headroom.
- B. About 203 mm (8 in) is less than the recommended access headroom.
- C. About 254 mm (10 in) is less than the recommended access headroom.
Question 32
Where would an ICT distribution designer working for a company responding to a RFP expect to find requirements concerning alternative dispute resolution in the scope of work (SOW)?
- A. It would be expected in the portion of the scope of work (SOW) containing technical considerations.
- B. It would not be expected in the scope of work (SOW).
- C. It would be expected in the section of the scope of work (SOW) containing legal requirements.
- D. It would be expected in the part of the scope of work (SOW) delineating acceptance requirements.
Show answer and explanation ▾
Correct answer: B
A scope of work describes the work to be performed. Alternative dispute resolution is a contractual term that belongs in the conditions of the contract, so it would not be expected in the SOW.
Why the other options are wrong:
- A. Technical considerations cover the systems and work, not dispute procedures.
- C. Dispute resolution terms sit in the contract conditions, not in a section of the SOW.
- D. Acceptance requirements define how the work is tested and accepted, not how disputes are settled.
Question 33
What is the PRIMARY reason for considering a physical ring topology for connecting outlying buildings?
- A. It is an easier physical design to install.
- B. It is the most compelling design for any network requirement.
- C. It provides a redundant cable path for disaster recovery.
- D. It is the most cost effective design for a campus network.
Show answer and explanation ▾
Correct answer: C
A physical ring gives each outlying building two cable routes back to the main site. If one route is cut, service continues over the other, which is why it is considered for disaster recovery.
Why the other options are wrong:
- A. Ease of installation is not the primary reason for considering a ring.
- B. No single topology is the best choice for every network requirement.
- D. Low cost is not the primary reason for considering a ring.
Question 34
An ICT distribution designer is determining the size of the equipment room (ER). The building has a usable floor area of 1393.5 m2 (15,000 ft2).
What is the MINIMUM size of the ER if the work area average is 9.29 m2 (100 ft2)?
- A. 9.29 m2 (100 ft2)
- B. 13.94 m2 (150 ft2)
- C. 15 m2 (160 ft2)
- D. 18.58 m2 (200 ft2)
Show answer and explanation ▾
Correct answer: B
The floor area holds 150 work areas of 9.29 m2 (100 ft2). For a building with this few work areas, the equipment room is sized at the minimum of 13.94 m2 (150 ft2).
Why the other options are wrong:
- A. 9.29 m2 (100 ft2) is the size of one work area, not of the ER.
- C. 15 m2 (160 ft2) is larger than the minimum size required.
- D. 18.58 m2 (200 ft2) is larger than the minimum size required.
Question 35
The options for terminating an unshielded twisted pair cable for a video surveillance camera at the camera end are an 8-pin 8-conductor outlet and
- A. shielded RJ-45 connector.
- B. 8-pin 8-contact plug.
- C. biscuit jack.
- D. 75 ohm balun.
- E. 50 ohm balun.
Show answer and explanation ▾
Correct answer: B
At the camera end, an unshielded twisted-pair cable can be terminated on an 8-pin 8-conductor outlet with a short cord to the camera, or directly with an 8-pin 8-contact plug that connects straight into the camera.
Why the other options are wrong:
- A. A shielded connector is not used to terminate unshielded twisted-pair cable.
- C. A biscuit jack is a surface-mount housing, not the second termination option named for cameras.
- D. A 75 ohm balun adapts coaxial video equipment and is not a cable termination option here.
- E. A 50 ohm balun is not a termination option for a twisted-pair camera cable.
Question 36
Telecommunications designs should include which three elements?
- A. Specifications, Drawings, & Cost Estimates
- B. Drawings, Bill of Materials, & Manufacturer’s Installation Requirements
- C. Equipment Cutsheets, Drawings, & One-Lines
- D. Performance Specifications, Proprietary Specifications, & Descriptive Specifications
Show answer and explanation ▾
Correct answer: A
A telecommunications design is made up of specifications that state the requirements, drawings that show where and how the work is installed, and cost estimates that set the budget.
Why the other options are wrong:
- B. A bill of materials and manufacturer installation requirements are supporting items, not the three design elements.
- C. Equipment cutsheets and one-line diagrams are supporting items, not the three design elements.
- D. These are three types of specification, which together make up only one element of a design.
Question 37
In the context of producing sound, molecules that move further apart from each other is known as
- A. extension.
- B. decompression.
- C. expansion.
- D. rarefaction.
Show answer and explanation ▾
Correct answer: D
A sound wave is a series of pressure changes in the air. Where the molecules are pushed together it is called compression, and where they move further apart it is called rarefaction.
Why the other options are wrong:
- A. Extension is not the acoustic term for the low-pressure part of a sound wave.
- B. Decompression is not the acoustic term for the low-pressure part of a sound wave.
- C. Expansion is not the acoustic term for the low-pressure part of a sound wave.
Question 38
The recommendation for installation of a cable tray system in buildings with removable ceiling tiles is that they be installed with a clearance of ______ or greater above ceiling tiles and supporting T-bars.
- A. 51 mm (2 in)
- B. 77 mm (3 in)
- C. 102 mm (4 in)
- D. 152 mm (6 in)
Show answer and explanation ▾
Correct answer: D
Where ceilings have removable tiles, cable trays should be installed with 152 mm (6 in) or more of clearance above the tiles and supporting T-bars, so tiles can be lifted out and the tray reached.
Why the other options are wrong:
- A. 51 mm (2 in) is less than the recommended clearance.
- B. 77 mm (3 in) is less than the recommended clearance.
- C. 102 mm (4 in) is less than the recommended clearance.
Question 39
A design build firm has been retained by a client to construct an outpatient clinic. The client has hired an ICT distribution designer to review the DB firm’s work product ensuring that the certified final documents are complete. In what capacity would the designer MOST LIKELY be serving?
- A. Quality Control (QC)
- B. Quality Assurance (QA)
- C. ICT Designer of Record (DOR)
- D. Project Management (PM)
Show answer and explanation ▾
Correct answer: B
A designer engaged by the client to review another firm's work product and confirm the final documents are complete is performing quality assurance, an independent check that the process delivered what was required.
Why the other options are wrong:
- A. Quality control is carried out by the firm producing the work on its own output.
- C. The designer of record is the party that produces and certifies the design, here the design-build firm.
- D. Project management directs scope, schedule and budget rather than auditing documents.
Question 40
Telecommunications space sizing guidelines for horizontal cabling distribution are based on distributing telecommunications services to one individual work area per how much usable floor space?
- A. ≈3.10 m2 (33 ft2)
- B. ≈4.65 m2 (50 ft2)
- C. ≈9.30 m2 (100 ft2)
- D. ≈11.16 m2 (120 ft2)
Show answer and explanation ▾
Correct answer: C
Sizing guidelines for telecommunications spaces assume one individual work area for about every 9.30 m2 (100 ft2) of usable floor space.
Why the other options are wrong:
- A. About 3.10 m2 (33 ft2) is not the planning figure for one work area.
- B. About 4.65 m2 (50 ft2) is not the planning figure for one work area.
- D. About 11.16 m2 (120 ft2) is not the planning figure for one work area.
Question 41
In a design type Scope of Work (SoW), the ICT distribution designer is responsible for providing
- A. specific products and materials.
- B. a safety plan.
- C. a user needs analysis.
- D. stakeholder requirements.
Show answer and explanation ▾
Correct answer: A
A design type scope of work tells the contractor exactly what to build, so the designer is responsible for naming the specific products and materials to be used.
Why the other options are wrong:
- B. A safety plan is prepared by the contractor carrying out the work.
- C. A user needs analysis is done before the scope of work is written.
- D. Stakeholder requirements come from the client and other stakeholders, not from the designer.
Question 42
Which requirement does the ICT distribution designer provide to the Mechanical Engineer in charge of the HVAC design for a Telecommunication Space?
- A. The heat load (BTU [calorie]/hour) of all equipment installed within the space
- B. Location and size of condensate drain
- C. Location of the telecommunications own dedicated electrical distribution panel
- D. The quantity and size of HVAC vents needed for the room
Show answer and explanation ▾
Correct answer: A
The mechanical engineer sizes the cooling for a telecommunications space from the heat the equipment gives off, so the designer supplies the heat load in BTU per hour of all equipment installed in the space.
Why the other options are wrong:
- B. The condensate drain is designed by the mechanical engineer.
- C. The electrical panel location is coordinated with the electrical engineer.
- D. The quantity and size of vents are determined by the mechanical engineer.
Question 43
Smaller buildings with a serving area larger than 1000 ft2 and less than 5000 ft2 may be served by
- A. self-contained cabinets.
- B. wall cabinets.
- C. shallow rooms.
- D. enclosed cabinets.
Show answer and explanation ▾
Correct answer: C
A building with a serving area larger than 1000 ft2 and less than 5000 ft2 does not need a full telecommunications room and may be served by a shallow room.
Why the other options are wrong:
- A. Self-contained cabinets are not the provision stated for this size range.
- B. Wall cabinets are for serving areas smaller than this range.
- D. Enclosed cabinets are not the provision stated for this size range.
Question 44
The size of the pathway using slots should be one slot sized at ___________ for up to 3716 m2 (40,000 ft2) of usable floor space served by that backbone distribution system.
- A. 0.03 m2 (45 in2)
- B. 0.04 m2 (60 in2)
- C. 0.05 m2 (77 in2)
- D. 0.06 m2 (90 in2)
Show answer and explanation ▾
Correct answer: B
Where slots are used for the backbone pathway, one slot of 0.04 m2 (60 in2) is provided for up to 3716 m2 (40,000 ft2) of usable floor space served by that backbone distribution system.
Why the other options are wrong:
- A. 0.03 m2 (45 in2) is smaller than the specified slot size.
- C. 0.05 m2 (77 in2) is not the specified slot size for this floor space.
- D. 0.06 m2 (90 in2) is not the specified slot size for this floor space.
Question 45
In order for an ICT distribution designer to identify the BEST solutions for the client’s needs, they may have to provide
- A. subcontractors lists.
- B. material lists (e.g., BOM).
- C. Operation and Maintenance manuals.
- D. shop drawings.
Show answer and explanation ▾
Correct answer: C
Operation and maintenance manuals show how proposed systems are run and maintained over their life, and the designer may have to provide them so the solution chosen suits the client's needs.
Why the other options are wrong:
- A. A subcontractors list names who will do the work and does not help compare solutions.
- B. A material list quantifies a solution that has already been selected.
- D. Shop drawings are prepared by the contractor to show how selected products will be installed.
Question 46
An ICT distribution designer installed a 62.5 mm/850 nm fiber optic cable from Building A to Building B with a distance of 1000 m (3280 ft). At Building B the designer fusion splice this new cable to an existing identical 62.5 mm fiber optic cable that runs 700 m (2300 ft) to Building C. Both ends are terminated with ST connectors.
What is the WORST case loss budget for the above fiber link?
- A. 6.20 dB
- B. 7 dB
- C. 7.75 dB
- D. 8.30 dB
Show answer and explanation ▾
Correct answer: C
The link is 1.7 km of 62.5 µm fiber at 3.5 dB/km at 850 nm, which is 5.95 dB. Two mated connector pairs at 0.75 dB each add 1.5 dB and one fusion splice adds 0.3 dB, for a total of 7.75 dB.
Why the other options are wrong:
- A. 6.20 dB does not include the full fiber, connector and splice losses.
- B. 7 dB does not include the full fiber, connector and splice losses.
- D. 8.30 dB is more than the fiber, connector and splice losses add up to.
Question 47
Which two of the following components are included in a backbone distribution system (BDS)? (Choose two.)
- A. Work area outlets
- B. Telecommunications enclosures
- C. Equipment Cord
- D. Equipment rooms
- E. Horizontal Cable
Show answer and explanation ▾
Correct answer: B, D
The backbone distribution system links the telecommunications spaces of a building or campus, so it includes equipment rooms and telecommunications enclosures along with the backbone cables and pathways between them.
Why the other options are wrong:
- A. Work area outlets belong to the horizontal distribution system.
- C. An equipment cord connects active equipment and is not a backbone component.
- E. Horizontal cable belongs to the horizontal distribution system.
Question 48
What is the lightest-weight metallic conduit manufactured?
- A. IMC
- B. AMC
- C. RMC
- D. EMT
Show answer and explanation ▾
Correct answer: D
Electrical metallic tubing has the thinnest wall of the metallic conduit types, which makes it the lightest. It is joined with compression or set-screw fittings instead of threads.
Why the other options are wrong:
- A. Intermediate metal conduit has a thicker wall and weighs more than EMT.
- B. AMC is not the lightest-weight metallic conduit.
- C. Rigid metal conduit has the thickest wall and is the heaviest.
Question 49
In specifying labels and printed tags that meet Underwriters Laboratories (UL) 969 Standard, marking and labeling systems are provided following the listed metrics.
Which two of the following are REQUIRED for the UL standard? (Choose two.)
- A. Adhesion test
- B. Texture test
- C. Visual inspection
- D. Durability test
- E. Thickness test
Show answer and explanation ▾
Correct answer: A, C
UL 969 covers marking and labeling systems used as permanent markings on products. The two required checks are an adhesion test, which confirms the label stays attached, and a visual inspection, which confirms the marking remains legible.
Why the other options are wrong:
- B. A texture test is not one of the two required checks.
- D. A durability test is not one of the two named requirements.
- E. A thickness test is not one of the two required checks.
Question 50
In which of the following design phases does the ICT distribution designer perform coordination with stakeholders and other disciplines (e.g., mechanical, architectural, electrical) to ensure that the design is constructible and that any conflicts are resolved early in the process?
- A. Schematic Design (SD)
- B. Concept Design
- C. Design Development (DD)
- D. Construction Document (CD)
Show answer and explanation ▾
Correct answer: B
Coordination with stakeholders and the other disciplines begins in the concept design phase, so that constructability problems and conflicts are found and resolved early, before detailed design work is produced.
Why the other options are wrong:
- A. Schematic design is not the phase identified for this early coordination.
- C. Design development is not the phase identified for this early coordination.
- D. The construction document phase is too late to be resolving conflicts early.
Question 51
The ICT distribution designer discovers a bonding and grounding conflict when reviewing the contract information, provided by the contract administration team, that the stated requirements differ from those of the manufacturer, local safety codes and BICSI guidelines. The designer should
- A. submit an RFI to the DOR requesting instruction.
- B. resolve the issue with the AHJ before proceeding.
- C. follow the BICSI guidelines.
- D. follow the manufacturer’s recommendation to ensure warranty provisioning.
Show answer and explanation ▾
Correct answer: A
When contract requirements conflict with manufacturer instructions, codes or guidelines, the designer does not choose between them. A request for information is submitted to the designer of record, who is responsible for the design and issues the instruction.
Why the other options are wrong:
- B. Going to the AHJ bypasses the designer of record, who is responsible for the contract documents.
- C. Following BICSI guidelines on personal initiative departs from the contract without authorization.
- D. Following the manufacturer on personal initiative departs from the contract without authorization.
Question 52
For a six story building (plus a basement), each of the six floors has a useable area of ≈3716 m2 (40,000 ft2). There are two riser systems, each serving half of the useable area on each floor.
What are the sleeves quantity and configuration required from fifth floor to sixth floor?
- A. Two sleeves
- B. Three sleeves
- C. Four sleeves
- D. Five sleeves
Show answer and explanation ▾
Correct answer: D
The number of sleeves in a backbone pathway is set by the usable floor area that the riser serves. For each riser between the fifth and sixth floors of this building, five sleeves are required.
Why the other options are wrong:
- A. Two sleeves is fewer than the required quantity.
- B. Three sleeves is fewer than the required quantity.
- C. Four sleeves is fewer than the required quantity.
Question 53
An ICT distribution designer is reviewing design documents with the owner to gain approval for an ER design.
Which of the following information about the site shall be included?
- A. Sustainability requirements
- B. Access and/or service provider requirements
- C. Suitability requirements
- D. Designer requirements
Show answer and explanation ▾
Correct answer: B
An equipment room commonly houses or connects to the service entrance, so the site information presented for approval shall include access and service provider requirements, such as how providers reach the room and what space they need.
Why the other options are wrong:
- A. Sustainability requirements are not the site information that shall be included for an ER design.
- C. Suitability requirements are not the site information that shall be included for an ER design.
- D. Designer requirements are not site information.
Question 54
When responding to a submittal that has been rejected and/or has comments written by a reviewer, the ICT distribution designer may need to perform which two of the following actions? (Choose two.)
- A. Review the contract requirements and revise the submittal to comply with these requirements.
- B. Request a Change Order from the client for the extra work performed.
- C. Submit an alternate product in lieu of one that was previously submitted, even if it does not meet all of the contract requirements.
- D. Document the reviewer’s status and/or comments.
- E. Request a variance from the contract requirements from the client.
Show answer and explanation ▾
Correct answer: C, E
When a submittal is rejected or returned with remarks, the designer may need to submit an alternate product in place of the original, and where that product does not meet every contract requirement, request a variance from the client.
Why the other options are wrong:
- A. Revising the same submittal is not one of the two actions identified for this situation.
- B. Responding to a rejected submittal is not extra work that earns a change order.
- D. Recording the reviewer's status is record keeping and not one of the two actions identified.
Question 55
In a joint trench using concrete, what is the MINIMUM vertical and horizontal separation between the electrical and the ICT distribution designer conduits?
- A. 50 mm (2 in)
- B. 77 mm (3 in)
- C. 101 mm (4 in)
- D. 152 mm (6 in)
Show answer and explanation ▾
Correct answer: B
In a joint trench, telecommunications conduits must be separated from electrical conduits by at least 77 mm (3 in) of concrete, both vertically and horizontally. Greater separation is needed with masonry or well-tamped earth.
Why the other options are wrong:
- A. 50 mm (2 in) is less than the minimum separation in concrete.
- C. 101 mm (4 in) is the separation used with masonry, not concrete.
- D. 152 mm (6 in) is more than the minimum separation in concrete.
Question 56
Who prepares the submittals that are reviewed and approved to ensure that the client’s design criteria is met in regards to material selection?
- A. ICT distribution designer
- B. General Contractor
- C. Client
- D. Architect, Engineering, Consultant Team
Show answer and explanation ▾
Correct answer: B
Submittals are prepared on the construction side: the general contractor, with its subcontractors and suppliers, assembles the product data and sends it to the design team, which reviews and approves it against the client's design criteria.
Why the other options are wrong:
- A. The ICT distribution designer reviews submittals and does not prepare them.
- C. The client sets the design criteria and does not prepare submittals.
- D. The architect, engineering and consultant team reviews and approves submittals.
Question 57
Rolling objects create what type of load on an access flooring system?
- A. Dynamic
- B. Impact
- C. Static
- D. Physical
- E. Virtual
Show answer and explanation ▾
Correct answer: B
Access floor panels are rated for several load types. Objects rolling across the floor, such as loaded carts and equipment on casters, are treated as creating an impact load on the system.
Why the other options are wrong:
- A. Dynamic is not the load type named for rolling objects here.
- C. A static load comes from equipment that stays in one place.
- D. Physical is not an access floor load rating.
- E. Virtual is not an access floor load rating.
Question 58
What is the MAXIMUM number of work areas served by a single Multiuser Telecommunications Outlet Assembly (MUTOA)?
- A. 5
- B. 10
- C. 12
- D. 18
Show answer and explanation ▾
Correct answer: C
A multiuser telecommunications outlet assembly is limited to serving a maximum of 12 work areas. Where an open office cluster has more work areas than that, additional assemblies are used.
Why the other options are wrong:
- A. Five work areas is below the maximum that one assembly is allowed to serve.
- B. Ten work areas is below the maximum that one assembly is allowed to serve.
- D. Eighteen work areas exceeds the limit for a single assembly.
Question 59
What is the MINIMUM lighting requirement for telecommunications spaces?
- A. 50 lux (4.6 foot-candles) of lighting in the horizontal plane and 20 lux (1.9 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor
- B. 200 lux (18.6 foot-candles) of lighting in the horizontal plane and 500 lux (46 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor
- C. 500 lux (46 foot-candles) of lighting in the horizontal plane and 200 lux (18.6 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor
- D. 500 lux (46 foot-candles) of lighting in the horizontal plane and 500 lux (46 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor
Show answer and explanation ▾
Correct answer: C
Telecommunications spaces need a minimum of 500 lux (46 foot-candles) in the horizontal plane and 200 lux (18.6 foot-candles) in the vertical plane, measured 1 meter (3.28 feet) above the finished floor. That level lets technicians read labels and terminate cabling on racks and backboards.
Why the other options are wrong:
- A. These values are far below the minimum lighting level required in a telecommunications space.
- B. This reverses the two values: the higher figure applies to the horizontal plane, not the vertical plane.
- D. The vertical plane minimum is 200 lux, not 500 lux.
Question 60
An ICT distribution designer is coordinating with local agencies for an upcoming campus improvement project which could affect the design.
Which two of the following listed items will MINIMIZE design changes once the project begins? (Choose two.)
- A. Identification and agreement of conduit pathway routes
- B. Hand off of documentation to project manager
- C. Identification of maintenance holes, hand holes locations
- D. Approval of budget by chief financial officer (CFO)
- E. Approval of permit by AHJ - local Fire Marshal
Show answer and explanation ▾
Correct answer: A, C
Agreeing on conduit pathway routes and fixing the locations of maintenance holes and handholes with the local agencies early settles where the outside plant will run. With routes and access points agreed before work starts, later conflicts with utilities and rights-of-way are far less likely to force redesign.
Why the other options are wrong:
- B. Handing documentation to the project manager is an administrative step that does not resolve route or location conflicts with local agencies.
- D. Budget approval by the CFO is internal funding sign-off and does not settle design details with local agencies.
- E. A Fire Marshal permit covers code approval and does not establish the campus pathway routes and access points that drive design changes.
That was 60 of 358.
The full BICSI RCDD pack has all 358 questions, each with the answer, the explanation and why the other options are wrong, plus a questions-only copy for timed runs. $39.00 USD, paid once, with free monthly updates and a pass-or-your-money-back guarantee.
Get the full packNot ready yet? Get the first 62 free as one PDF by email. Get the Half Pack →
About the RCDD exam
These 60 BICSI RCDD questions are free here. The free PDF has 62, free by email.
They are drawn from the same bank as the full RCDD pack, which has 358 questions in total.